Project Scope:

Draper St Diesel & Wharf Manifold Automation   Fire System Upgrade

  • Densitometers on wharf lines.
  • 10 Actuated 200-300NB DBB valves
  • AB Panelview display for manifold control.
  • New Jet fuel pipeline
  • Upgrade bunker line to 200NB
  • 180m x 300NB Dock line
  • New testing laboratory
  • Recommission Draper St Terminal tanks C7 & C8 to Diesel Service including TPSV’s
  • Relocate Diesel pump to Draper St Terminal
  • Convert tank A4 to Diesel service
  • New Kenny St. Terminal Main Switchboard
  • New fire pump house
  • Two Diesel powered fire water pumps
  • New foam pumps & foam supply
  • Foam distribution piping, foam pourers and deluge system on gantry
  • Upgrade fire water hydrant ring main
  • New 1ML firewater tank
  • New cooling rings on storage tanks with dedicated supply lines

TFA Role:

  • Project Management
  • Facilitation of Approvals
  • Functional Specification
  • Detailed Design
  • Equipment & Instrument Data Sheets
  • PLC Logic
  • Construction management
  • Commissioning
  • P&ID’s
  • Hydraulic pipe flow modelling
  • Pump specification and sizing
  • Piping Isometrics
  • Civil and Structural design
  • Fire fighting design
  • Electrical & Instrumentation design
  • Hazardous Area Drawings

 

Over 2001 / 2002 TfA completed a major refurbishment of the Caltex Cairns Terminal including new Terminal Automation System, Two Bay Bottom Loading Gantry, Piping and Pumps.

Project Scope:

  • New 2 bay bottom loading Gantry
  • TTFS Building
  • Seven new gantry product pumps
  • Product piping replacement from tanks to pumps to gantry.
  • New Office
  • 20kL Spill Collection tank & Drainage Upgrade
  • New piping from tanks to gantry
  • New Wider Road Entry
  • Automated Entry & Exit Gates
  • Paving of all Trafficable Areas
  • New Terminal Automation System
  • Lighting Upgrade
  • New Main Switchboard & PLC System

TFA Role:

  • Project Management
  • Coordination of Approvals
  • Functional Specification
  • Detailed Design
  • Tender Documentation & Specifications
  • PLC & Operating Logic
  • Construction management
  • Commissioning
  • P&ID’s
  • Hydraulic modelling, Pump sizing
  • Piping Isometrics
  • Civil Design Pavements & Cross Overs
  • Structural Design Buildings
  • Fire fighting design