TFA was involved in the approvals, design, construction assistance and project management of four (4) x 1000m pipelines for transfer between a brownfield and greenfield storage terminals in Pinkenba, Qld. The pipeline corridor is located in loose marine soils with a high water table.
Project Scope:
- 4 x 300NB 1km piggable pipelines
- 80 m tunnel bore road crossing with 2100mm diameter concrete jacking pipe
- 4 x DN100 and 1 x 110OD HDPE Sewer Main spanning the 1km corridor
TfA’s Role included:
- Assistance with Approvals for pipeline corridor (Development Application)
- Operational works approvals & submission of DA Conditions assessments
- Preliminary Design Drawings
- Cost Estimate
- Detailed Design Drawings
- Tendering and Procurement
- Pipeline burial details
- Engineering specifications for trenching, welding, trenching excavation & backfilling, tunnel boring and cathodic protection
- Datasheets, equipment schedules and material take-offs
- Project management for Execution of project
- QA & Compliance inspections and review of contractor submitted documentation