SAMI Bitumen operates an existing bitumen processing, import and export terminal facility within the industrial precinct of Kwinana, WA.
TFA were engaged by SAMI to undertake the detailed engineering design of a PMB, CRMB and Emulsion expansion to the existing facility. The project included PMB, CRMB, Emulsion and Hot Oil skid packages, 11 x 100T storage tanks, new gantries, and associated infrastructure.
This project utilised TFA’s extensive bitumen expertise which has been developed over 25 years of successfully designing and implementing bitumen storage facilities and associated pipelines.